60-Minute Prototype Workflow
✓ Did you learn something? ✓ Does the team understand the idea now? ✓ Did you validate or invalidate an assumption?
The template
60-Minute Prototype Workflow
Timeline Overview
Minutes Block Activity
0-5 Setup Define success, gather context
5-15 Design Create wireframe/mock
15-30 Build Tool or clickthrough
30-45 Test Use it, break it, refine
45-55 Iterate One quick fix
55-60 Present Demo & next steps
Stage 1: Setup (0-5 minutes)
Define Success
- What problem does this solve?
- Who is the user and what do they do?
- How will you know if it works? (One key metric or behavior)
AI Prompt
I'm prototyping [feature description].
Success looks like: [describe the outcome]
Build for: [user type and their context]
Give me a simple wireframe outline.
Decision Point: Is the scope realistic for 60 min? If not, descope.
Stage 2: Design (5-15 minutes)
Create a wireframe (hand-draw or use AI to generate ASCII art)
AI Prompt
Create an ASCII wireframe for [feature].
User flow: [describe steps]
Key elements: [list what must be on screen]
Keep it simple and annotated.
Output: Wireframe sketch + user flow notes
Stage 3: Build (15-30 minutes)
Tool depends on your prototype:
- Figma for visual design (10 min mockup)
- Docs/Slides for interactive clickthrough
- Google Sheets for data workflow
- Simple HTML/CSS for web
- Loom/ScreenFlow for walkthrough video
Key Rule: Fake it till you make it. Use placeholder content. Links don't need to work.
AI Prompt (if needed)
Generate [HTML/CSS/pseudo-code] for:
[paste your wireframe]
Style: clean and minimal
This is a prototype, so it's okay if it's rough.
Stage 4: Test (30-45 minutes)
Use It Yourself
- Follow the user flow you designed
- Can a first-time user understand it?
- Does it feel fast or clunky?
- Are there confusing moments?
Break It
- Try edge cases (what if there's no data?)
- What happens on mobile or slow connection?
- Try extreme inputs
Document Issues
- Note 3 biggest friction points
- Rate each: cosmetic / nice-to-have / blocking
Decision Points
- Does it solve the problem? (Yes → move forward)
- Too complex? (Descope → remove features)
- Missing something critical? (Add it if <5 min)
Stage 5: Iterate (45-55 minutes)
Pick ONE fix (not three)
- Biggest blocker from testing
- Takes <5 minutes to implement
AI Prompt (if you're stuck)
I tested this and got stuck on: [describe the issue]
Quick fix ideas?
Then iterate once. Don't try to polish everything.
Stage 6: Present (55-60 minutes)
Ship It Checklist
- Take a screenshot or recording
- Write the one-sentence problem it solves
- List what you tested
- Note the #1 thing to improve next
- List unknowns (what you didn't test)
Demo Script (2 minutes)
Problem: [1 sentence]
Solution: [1 sentence]
How it works: [walkthrough, 30 seconds]
Next steps: [what we learned, what to build next]
Share with team in Slack or scheduled meeting
Success Criteria
✓ Did you learn something? ✓ Does the team understand the idea now? ✓ Did you validate or invalidate an assumption?
If yes to all three: prototype worked.